Postline & Final fitting

This phase is focused on the finalization of both interior and exterior finishes, following the completion of the exterior cladding. involves thorough painting, flooring installation, and the precise setup of all plumbing and fixtures. Additionally, cabinetry will be installed, and a comprehensive site cleanup will conducted to ensure a clean and polished environment.

Wall Plastering Work

Postline

Plasterboard installations will occur in this stage, covering structural bracing, wet area linings, fire safety, and ceiling diaphragms. Each component is vital for the building's integrity and safety. We are dedicated to delivering high-quality results.

Trowel Applying Cement

External & Internal Finishing

External cladding installation is complete, with the external walls sanded and painted. The internal walls have also been plastered and painted, ensuring a fresh and polished look throughout.

Modern Bathroom Design

Final Fitting

Plumbing Fixtures

Electrical Fittings

Cabinetry and Countertops

Interior Finishing

Floor Coverings

Final Touches

Contact us now to book a half-hour free consultation
We will assist you at any stage of the development

Thanks for submitting!

Address

North Shore, Auckland

Phone

021 266 8788

Email

Contact us now for your property development needs.

© 2026 by AOFA Limited

bottom of page