top of page
Under Construction Interior

Preline

​In the preline phase, all internal services must be installed, and insulation must be added. All works will be inspected by the city council to ensure adherence to building code standards.

Image_20251221164353_274_2.jpg

Plumbing

Water supply pipes, which include those for drinking water and hot water, are essential components. Plumbing drainage systems carry all wastewater out of the house and direct it into the public sewage system.

Electrical Panel Closeup

electricity & lighting

Licensed electricians will install all the electrical wiring throughout the rooms and provide power points for future use. Additionally, the lighting points should be planned and installed during this stage.

Modern Air Conditioner

Other serviers

Services like air ducting, air conditioning central heating systems, and central vacuum systems should also be installed during the preline stage.

Contact us now to book a half-hour free consultation
We will assist you at any stage of the development

Thanks for submitting!

Address

North Shore, Auckland

Phone

021 266 8788

Email

Contact us now for your property development needs.

© 2025 by AOFA Limited

bottom of page